MBRDNA Fuel Cell and Telematics lab in Palo Alto:
designed by CONima Architects
One of those cases where a picture can only hint at the challenges that went into creating it. For this space, not only did we have the standard automobile lab challenges of getting cars into an office building and safely exhausting the engines outside of the building, we had the added challenge of monitoring and exhausting hydrogen in order to prevent any possible explosions. Lastly, the cars were required to be placed on portable lifts. This meant that not only did the building foundation have to be strengthened to handle the weight of several automobiles, the first floor slab of the building had to be lowered by one foot to allow enough clearance for raised vehicles.