Wednesday, June 18, 2014
Reflecting on 10 years
Thursday, August 23, 2012
the Stories of Buildings
I've always been a bit puzzled by the ego of many architects. The belief for many seems to be that buildings are an expression of the architect's personal philosophy and attitudes towards the world. The problem with this approach is that buildings and architecture, when at their best, become an embodiment of the ideals of those who inhabit and use them.
Our philosophy of architecture has always been to help unleash the creativity of the end user through the development of an intimate understanding of their difficulties, desires, and ambitions. We take this approach of empathy towards the users so that a building not only provides usable space, but becomes a usable, functional expression of the client and end users needs and aspirations.
In many ways, we believe the architect's role is to facilitate the creative process for the client. This does not mean however that the we become a drafting and permitting service for them. It is our responsibility to respectfully challenge their existing notions to find unexpected and innovative solutions.
Ultimately, these things are critical for companies. A building or space is a highly visible component of a company brand that impacts both external and internal perceptions of a business. The care and thought behind every decision becomes obvious after several thousand cumulative man-hours in a space. The building quite literally portrays an identity, it is a realization of identity through the built form. Your hopes, your needs, your story.
These stories become our journey to understand and help shape attitudes about the world we share.
Wednesday, August 22, 2012
Renaissance Mill
Tuesday, August 21, 2012
Why Innovate?
I've always been bothered by the phrase, "Don't reinvent the wheel." Is the wheel really that perfect? Over time it's continually been improved. Spokes and tires have been added to improve performance and durability. However, a wheel still only follows one vector on its own so steering wheels have been attached to allow turning. Should we abandon wheels altogether? A sphere could turn in any direction if we could just figure out how to balance a load on it while controlling its movement. Wheels themselves serve merely to hold us to the ground when perhaps we should fly.
Everyday we make the future. Why not make it better?
Thursday, July 28, 2011
CONima Architects' latest project is in Bloomberg Businessweek

Sunday, July 24, 2011
Serious Energy select CONima Architects
Wednesday, July 21, 2010
Equilar construction progress
second floor open office - June 17


2nd Floor Open office - July 21

reception area - July 21
Monday, February 1, 2010
Saba selects CONima Architects
Monday, September 14, 2009
Programming and Pre-design
The owner's original drawings for the building showing survey dimensions. (Owner's drawings do not match existing conditions)
Pre-design bubble drawing showing early space planning.
Case Study Of A Dental Office Remodel By CONima Architects
CONima Architects was recently contracted to remodel an existing building and transform it into a dental office.
A view of the dated existing bathroom.
Saturday, April 4, 2009
Successful Environmental Inititiative
Using the figure that 1 tree can make 16 reams of paper, which is just over 5,000sf, this means we are capable of saving an average of 4 trees for every project we do.
Tuesday, March 31, 2009
Midnight Oil
As I push my way through multiple 14 hour workdays, my mind has begun to stray from the task at hand. What seems more interesting to me now than coordinating a multifloor bathroom redesign and whether or not I will meet my deadline, is the role of stress in creativity, and the human capacity for motivation.
In architecture school I would often complain that programmatic and code requirements were totalitarian like obstacle in the path of great design. The truth however is that these obstacles are the only possible way to achieve great design. Not only do they provide purpose, whether filling the needs of a client or ensuring safety and accessibility to the occupants, they provide the basic challenge that must be struggle with and against in order to create something that is both beautiful and original.
What also strikes me is how significant the role of music is in creative enterprise. It allows your mind to be free from sensing all that present and around you. By engrossing your senses, it allows greater focus. The constancy of its rhythm allows you to charge through the night as if you were charging into battle.
Tuesday, March 24, 2009
EPRI selects CONima Architects
Wednesday, March 4, 2009
Project Sequencing
Quality:
The main aspects of quality that suffer when a project does not have adequate time are materials. Almost all common building materials, unless already in stock and available, take 4 to 6 weeks to make. If specialty finishes or items are needed for their fabrication, then it can take 8 to 12 weeks. To break this down, use carpet as an example:
If a construction schedule is less than 4 weeks, carpet selection is limited to in stock items only.
If the schedule is extended to 6 weeks, 'standard' and 'quick ship' items now become available, even possibly if they are not currently in stock because the manufacturer already has the necessary yarn
However any higher end carpet will require a minimum 8 to 12 weeks in order to aquire the yarn, ship it to the carpet factory, make the carpet, and ship it to the construction site.
Now consider in the carpet scenario that the same thing is occurring in regards to cabinets, doors, furniture, and a host of other items. These items cannot all be installed simultaneously. Once this is taken into consideration, it becomes clear that, unless finish materials are identified and order prior to the start of construction, most tenant improvement type projects will require a minimum 12 to 14 week schedule for construction.
Creativity:
The limiting factors for creativity are two-fold. An abbreviated construction schedule limits the material choices available to a project. Also, the sequence of events that are needed to design properly are often forced to be abbreviated or eliminated altogether. The following stages of events and rough time lines should be taken into account:
Programming - May be done in house prior to hiring an architect, or done over a period of several days or weeks (depending on size) with an architect
Field Survey - one to three days typically for projects that are limited to interior scope
Schematic Design - This phase is highly variable. Depending upon the ability to reconcile a clients programmatic and stylistic needs within the framework of the building that has been selected, it can vary from 1 week to 1-2 months. However, for most small to mid-size projects accomodating 2 weeks for the planning of this should be sufficient.
Design Development and Code Analysis - This phase is mostly determined by the size and age of a building, and should range from 2-4 weeks. However on smaller projects this can commonly be condensed to one week.
Contract Documents - The final phase of architectural work prior to permitting is the creation of all drawings, details, and specifications for construction, as well as all information related to accessibility and life safety necessary for permitting. This work requires several weeks in most cases.
With all of this work taken into account, the design phase of a tenant improvement project should include 4 weeks for small projects, and 12-16 weeks for larger and more complex ones. When this process is shortened, proper programming usually has not taken place and the project specifications are left more generalized. Under extreme shortening of the process, an initial set may be required for permitting purposes only, with the knowledge that some construction details are not fully resolved. This of course leads to the last area of sacrifice.
Cost:
Cost gets impacted in three ways primarily.
Incomplete designs are bid to contractors, which result in modifications along the way that result in change orders to the construction contract.
The construction schedule does not have adequate time to allow for proper sequencing of events which results in overtime costs for construction labor
General Contractors are not given adequate time to investigate possible hidden deficiencies within a building, resulting in added costs to remedy those unforeseen conditions.
The variations of problems and requirements are endless, and ultimately every project must make sacrifices somewhere along the way. However having an experienced architect involved as early in the process as possible will help tremendously to navigate through these issues. A good architect can also overcome most of the scheduling hurdles thrown their way, but if the process is shortened, both the client and architect should discuss what sacrifices it will entail prior to starting work.
Friday, February 20, 2009
Commercial Lease Negotiations
Unfortunately, I've probably seen clients spend well over twice that amount trying to resolve fundamental problems with buildings that went unnoticed because they were not evaluated prior to leasing.
So numbers are easy to throw out and they sound impressive, but they mean very little without understand what an architect actually does during the site selection and lease negotiation phases of a project. For this article, I will focus on tenant improvement related work only, as core and shell construction has an entirely separate set of concerns.
So what are the tasks?
Programming and Fit Planning:
Every client knows how many people they have working for them, and most have an idea how many they want to plan for in the future. However working off of simple ratios of square footage per person ignores office standards, adjacency requirements, ancillary spaces, labs, data centers, etc...all of which are critical components to laying out a space successfully. Unfortunately, once a lease is signed, it is too late to make sure that the building suits your needs, and typically will result in making some level of sacrifice in programmatic functionality of a space.
Egress and Path of Travel:
Nobody would advertise a building that doesn't meet code, right? This is a much more frustrating problem for clients that I've had to resolve for both landlords' and tenants'. The problem is twofold.
- Codes change every few years, and things that were legal when a building was built are no longer so. With the recent adoption of the International Building Code this problem has become so exaggerated that many buildings are no longer considered legal because the method of calculating allowable floor area has now changed. Modifications to the occupancy classification further complicate this, resulting in different exiting and fire rating requirements.
- Subdividing floorspace for multiple tenants is the other major cause of headaches. Code requirements change significantly when trying to exit multiple companies from one building or floor as opposed to just one. In this case the distance between exits, overall exit travel distance, fire protection systems, and fire separations become critical. As a simple rule of thumb, one of my professors once told me,"Draw a fire in front of an exit, now see how many will die as a result. If the answer is more than zero it's your fault."
This category has unfortunately made a few landlords hate me. Accessibility is a very broad topic, but the priorities to negotiate into a lease are those deficiencies that are the most expensive to repair.
- Bathrooms, not just having a 5ft wide stall, but making sure the toilet is spaced the correct amount from the adjacent wall, are grab bars present, how much clearance is in front of the toilet? How high are the counters? Is there adequate knee space below them? Do the shower dimension comply? Fixture mounting heights? etc... A single bathroom can quickly cost over $100,000 to bring into compliance
- Building Entry, the accessibility requirement for most buildings is to have a fully accessible path to the public way. Most cities will bend this to just require it to the parking lot, but this is not much relief. In California especially, for years California's guidelines differed from federal in how to create a curb ramp to an accessible parking space, causing a great deal of commercial parking lots to currently be illegal. Additionally, the slope of the sidewalk to the building, irregularities in pavers, damaged or raised door tresholds, etc...can also lead to a great deal of remediation work. A recent client had to spend $40,000 repaving the entry plaza to their office because their lease did not include a provision for maintaining and accessible pathway into the building.
Tuesday, February 10, 2009
Picture of the Day
designed by CONima ArchitectsMonday, February 9, 2009
Ring Central selects CONima Architects
Tuesday, December 16, 2008
got layoffs?
In today's economic times companies are less worried about finding new spaces and expanding, and are more inclined to be looking at layoffs and reducing footprint. In this scenario, having an architect who is familiar with interior remodels is more important than ever.
CLICK HERE FOR CASE STUDY
At CONima, we have experience in the architecture of consolidation through layoffs and as a means to generate additional income and lower overhead costs. We can work with you to establish office standards that allow for both employee privacy as well as improved workflow efficiency.